Freelancer: atonu
Partajează:
Semnalează intrarea

Mixed Use Development

This is our Initial Conceptual Site Layout. If the approach to the development and Zoning with the maximum capacity is acceptable then we will proceed further. we are open to accept any kind of directional comments to enrich the layout.

Intrarea #8 pentru concursul „                                                Austin, TX - Mixed Use Development
                                            ”

Panoul public de clarificare

  • atonu
    atonu
    • acum 5 ani

    as per our calculation we can accommodate all your desired number of containers with interesting interlocking spaces as per usage category. we can also accommodate your desired number of parking if we go for multilevel parking and in that case one way circulation is required to solve the ramp with out wastage of ground level space.

    • acum 5 ani
  • atonu
    atonu
    • acum 5 ani

    if you are interested we can show our building module format in perspective sketches and we can show the reasoning for the Zoning, Circulation, Inner Court and usage and other issues.

    • acum 5 ani
  • atonu
    atonu
    • acum 5 ani

    we tried to distinguish the vehicle area and hangout area separately

    • acum 5 ani
  • atonu
    atonu
    • acum 5 ani

    As far we studied the local authority rules and regulations , it won't be a problem

    • acum 5 ani
  • atonu
    atonu
    • acum 5 ani

    thank you so much for your rating.

    • acum 5 ani
  • cst76
    Titularul concursului
    • acum 5 ani

    One way parking is interesting but may cause fire access issues.

    • acum 5 ani

Afișează mai multe comentarii Se procesează...