Închis

Asta Powerproject v13 professionals using Aspen OptiPlant 3D Layout and Aspen OptiRouter

Job Description:

Asta PowerProject v13 Aspen OptiPlant 3D Layout™ and Aspen OptiRouterSoftware experience required, understanding of installing and setting up an advantage on a Windows OS.

Aptitudini: Inginerie, Gestionarea proiectului

Despre client:
( 0 recenzii ) Syeen, Ireland

ID Proiect: #35841034

4 freelanceri licitează în medie 215$ pentru acest proiect

victoromondi188

Hi, I'm interested in your project, I'm a competent software developer with more than ten years experience. I have everything it takes to complete your project. we can connect remotely and help you out. Please reach ou Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% USD în 7 zile
(10 recenzii)
4.5
rashidamjad

Hi there, How are you? I can work with your project requirements mentioned. I can definitely pull it off once provided with detailed file of your requirements. Some points are needed to be discussed before starting so Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% USD în 8 zile
(1 părere)
3.6
engrehamsamir

Dear Client, kindly consider my bid as I'm a planning engineer and definitely can help you in your requirement, and i created already schedules with over than 3000 activities, and I usually construct it on primavera Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% USD în 2 zile
(0 recenzii)
0.0