Închis

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION

I NEED SOMEONE TO CREATE A PROGRAMME OF CONSTRUCTIONS WORKS AS PER THE PLAN ATTACHED

ONLY EXPERIENCED CONSTRUCTION EXPERTS NEED APPLY

Aptitudini: Gestionarea proiectului, Arhitectură, Planificare proiect, Building Information Modeling, Construction Engineering

Despre client:
( 1 părere ) COORPAROO, Australia

ID Proiect: #31923019

9 freelanceri licitează în medie 167$ pentru acest proiect

hany74

Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as M Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 3 zile
(41 recenzii)
5.5
(14 recenzii)
4.9
engrrockyalam

hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 3 zile
(33 recenzii)
4.4
engselgendy

How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manage Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 4 zile
(18 recenzii)
4.0
(1 părere)
2.3
raza61

Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 7 zile
(0 recenzii)
0.0
pkoutsis22

Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me direc Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 4 zile
(0 recenzii)
0.0
(0 recenzii)
0.0
harikamadduri

Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to op Mai multe

%bids___i_sum_sub_35%%project_currencyDetails_sign_sub_36% AUD în 5 zile
(0 recenzii)
0.0