Lifting method statment and risk assessment
Buget $30-250 USD
Job Description:
Lifting plan for concrete footing for temporary fence fixing footing concret weight is 60 kg the temporary fence to be fixed on 3325 LM
Acordat lui:
Hi Floki, I'm sending you the proposal for the lifting method statement, please approve the contract. Regards Gjoko
9 freelanceri licitează în medie 136$ pentru acest proiect
Hello I am a Graduate Engineer with MSc in Industrial Engineering and Management and a Bachelor's Degree in Mechanical & Industrial Engineering. I have experience in risk assessment, risk identification, ISO certifica Mai multe
Hi, Dear I have read your project description carefully. I am very excited to bid on your project. I am a mechanical engineer and have professional skill at mechanical design based on FEA. I mainly use SolidWorks, Abaq Mai multe
Hi, I can do Lifting method statement and risk assessment. Please message me for a detailed discussion. Thanks, Sidra
Hello I am very interested to work on Lifting plan for concrete footing for temporary fence fixing footing concret weight is 60 kg the temporary fence to be fixed on 3325 LM I am looking her long term relation with Cli Mai multe