Find Jobs
Hire Freelancers

Project for Integrated Process in Manufacturing Industries: (Garments Industries)

₹12500-37500 INR

Închis
Data postării: aproape 2 ani în urmă

₹12500-37500 INR

Plata la predare
This paper will suggest that the combination of Affinity Diagram, Matrix Diagrahm, Kaizen management - Problem-solving method 5W1H, SOP (Standard Operation Procedure ), and PDCA method will be used to make an integrated process Framework (IPW) for manufacturing business performance.
ID-ul proiectului: 34013612

Despre proiect

5 propuneri
Proiect la distanță
Activ: 2 ani în urmă

Vrei să câștigi bani?

Avantajele de a licita pe platforma Freelancer

Stabilește bugetul și intervalul temporal
Îți primești plata pentru serviciile prestate
Evidențiază-ți propunerea
Te înregistrezi și licitezi gratuit pentru proiecte
5 freelanceri plasează o ofertă medie de ₹21.050 INR pentru proiect
Avatarul utilizatorului
Hello! I have vast experience in Academic Writing, Academic Research and SPSS Statistics, and I am confident that I can produce quality content for you that will be of interest to your readers. I am available for a full-time writing position, and I am happy to work on a freelance basis if that is what you prefer. I look forward to hearing from you soon! Thank you for your time. Thank you - Wilfred
₹27.750 INR în 3 zile
5,0 (2 recenzii)
2,5
2,5
Avatarul utilizatorului
Hello hope you're having a great day. Your project reminds me of similar project which I completed recently. I can show you my samples as well. Your job details sparked couple of questions in my mind. Looking forward working together. Thanks
₹25.000 INR în 7 zile
0,0 (0 recenzii)
0,0
0,0
Avatarul utilizatorului
Hy dear, I will make you an integrated process framework within time frame and make assure to design your project as per your details.
₹25.000 INR în 7 zile
0,0 (0 recenzii)
0,0
0,0
Avatarul utilizatorului
Greetings. i am a LEAN and 6Sigma Black Belt, in the manufacturing and in the Design area for 3 decades. Successfully carried out Hands on work on more than 50 projects of different portfolio using the LEAN Principles and 6Sigma principles. Yes, these are possible. A few more you can include are 5S practice , safety implementation and goverance, SWI, VSM, POKA YOKE, 8WASTE Elimination, Product Life Cycle ( craddle to Grave). Adhering to OSHA/ISO Green manufacturing, ( ISO14001) and more. IFW focusses about End to end need, where as integrated process Management uses various methodologies to make the management transparent and help to see through from top to bottom (6sigma/ hoshin kanri/ LEAN/CLASS A/IATF/ISO/OSHA) etc. I can help you to complete the task successfully. pl. reach me to review further. Great Thanks. All the best.
₹15.000 INR în 7 zile
5,0 (1 recenzie)
0,0
0,0

Despre client

Steagul NETHERLANDS
Amsterdam, Netherlands
0,0
0
Metoda de plată a fost confirmată
Membru din iun. 27, 2022

Verificarea clientului

Mulțumim! Ți-am trimis prin e-mail linkul pe care trebuie să-l accesezi pentru a revendica creditul gratuit.
A apărut o eroare la trimiterea e-mailului. Încearcă din nou.
Utilizatori înregistrați Totalul proiectelor postate
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Se încarcă previzualizarea
S-a oferit permisiunea de depistare a locației.
Ți-a expirat sesiunea pentru conectare sau te-ai deconectat. Conectează-te din nou.